Canyon Roofing Co. · Saddlebrook Estates · Roofing
Full reroof, 26 sq architectural
$14,800
2026
Tear-off in one day, dry-in same day. Ridge vent done right. Dumpster fees in the bid.
Referrals
So you skip the bid circus. Good crews get the next job. Nobody’s house is on this page.
$4,100–$7,200
Median $6,120
$189–$11,200
Median $4,485
$2,980–$5,340
Median $4,120
$940–$2,140
Median $1,540
$6,400–$7,200
Median $6,800
$14,800
Median $14,800
$3,180
Median $3,180
$1,480
Median $1,480
$1,860
Median $1,860
$2,650
Median $2,650
Canyon Roofing Co. · Saddlebrook Estates · Roofing
$14,800
2026
Tear-off in one day, dry-in same day. Ridge vent done right. Dumpster fees in the bid.
Snake River Concrete · Willowmere at Lake Lowell · Concrete & foundation
$3,180
2026
Broom finish, control joints where they belong. Bid was middle of three.
Boise Basin Plumbing · The Orchards at Kuna · Plumbing
$940
2026
Builder said it was “within spec.” Pressure was 92 psi. Regulator solved the tub drip.
Treasure Valley HVAC · Saddlebrook Estates · HVAC
$11,200
2026
Original quote $8,900. Line-set and condensate pump added after demo. Ended at $11,200.
Boise Basin Plumbing · Willowmere at Lake Lowell · Plumbing
$2,140
2026
Same-day swap after the builder unit failed at year five. Fair price versus the big-box quote.
Bench Fence & Gate · The Orchards at Kuna · Fencing
$6,120
2026
HOA required the same cap and stain as phase 1. They had the spec on file.
Treasure Valley HVAC · Saddlebrook Estates · HVAC
$8,750
2026
Two-day swap. Pulled permit. Quoted $9,400 elsewhere for the same 16 SEER.
Sagebrush Landscaping · Saddlebrook Estates · Landscaping
$5,340
2026
Looked good when finished. Took five weeks for a ten-day job. Hard to get a call back.
Peak Paintworks · Willowmere at Lake Lowell · Painting
$6,400
2026
Moved furniture, cut clean lines, left the house better than they found it.
Treasure Valley HVAC · The Orchards at Kuna · HVAC
$220
2026
Airflow in the bonus room was 18% low. They adjusted dampers and left a report.
Sagebrush Landscaping · The Orchards at Kuna · Landscaping
$2,980
2026
They know the architectural committee packet. First submittal passed.
Bench Fence & Gate · Saddlebrook Estates · Fencing
$4,100
2026
Simple run. Showed up, built it, gone. $42.70 a foot.
Treasure Valley HVAC · Willowmere at Lake Lowell · HVAC
$189
2026
Found a disconnected return in the bonus room the builder missed. Fixed it under the visit.
Ridge Line Electric · Saddlebrook Estates · Electrical
$1,480
2026
Panel had a spare slot. Permit and inspection handled. Half the big-box price.
Pioneer Drywall · The Orchards at Kuna · Drywall
$1,860
2025
Original sub. Texture mismatch across the seam. Had to hire a different crew to float it.
Bench Fence & Gate · Saddlebrook Estates · Fencing
$6,480
2025
Replaced a failing builder fence. Straight line, tight rails. Neighbors hired them the next week.
Sagebrush Landscaping · Willowmere at Lake Lowell · Landscaping
$4,120
2025
Soil was builder-grade clay. They amended it without a fight. Sprinkler clock is a cheap unit.
Bench Fence & Gate · Willowmere at Lake Lowell · Fencing
$7,200
2025
Quote was $5,400. Gate hardware and extra posts showed up as change orders. Two weeks late.
Peak Paintworks · Saddlebrook Estates · Painting
$7,200
2025
Washed, scraped, primed the south wall. Two-coat. Still looks new a year later.
Bench Fence & Gate · Willowmere at Lake Lowell · Fencing
$5,850
2025
Beat two other bids by $900 and finished in four days. Posts set in concrete, not gravel.
Alta Irrigation · Saddlebrook Estates · Irrigation
$2,650
2025
Builder system was a spaghetti of mismatched heads. Pressure is even now.