From the porch · September 2026

Punch list vs. wish list

One is the job you paid for. The other is a new job. Mixing them is how good crews look bad.

If it was on the bid and it isn’t done, that’s punch. If you thought of it after they left, that’s a change order. Say which one you’re talking about before you rate anybody.

New construction settlement, hairline drywall cracks in the first year, and grade that holds a puddle after a storm are different problems. The first two are often the builder. The third might be the lot. A neighbor who writes “they ruined my house” without saying which is not advice.

A useful referral is: what was the scope, did the invoice match, did they come back. That’s enough. The next family can hire from that.